Past Work
Explore some of the past projects we have been involved in below.
Lambert Park Lift 2020
Placing a prefabircated bridge in a surburban Hobart park.
Port Arthur Lifts 2019
Precision lifts from the Port Arthur Historic Site out to Isle of the Dead.
Trefoil Island
Assisting with a solar installation in far north west Tasmania.
Three capes stage 2
Helicopter support for stage two of Three Capes Track construction (Hut construction and Cape Pillar)
Crescent Bay Walking Track 2020
An upgrade of an iconic Tasmanian coastal track.
Tasman Island Landing
Restoration of an historic landing at the base of Tasman Island.
Lake St Clair Trails
Helicopter lifts for track upgrades at Lake St Clair.
Friends of Tasman Island
Helicopter support for conservation work by Friends of Tasman Island.
Fire season 2018/19
Helicopter support for fire operations in Tasmania over the 2018/19 summer season.
Wild Mersey
Mountain bike trails near the North Western Tasmanian town, Latrobe.
Three Capes Stage 3
Helicopter support for stage three of Three Capes Track construction (Cape Raoul and Shipstern Bluff)
Three Capes Lodge Walk
Construction project of two high-end lodges within the Tasman National Park.
Milkshakes Reserve
Helicopter lifts for track work in the Milkshakes Reserve.
Fire Season 2015/16
Operations during the Tasmanian summer fire season 2015/16